Showing posts with label sewer system. Show all posts
Showing posts with label sewer system. Show all posts

Friday, August 21, 2009

It's the Faulconer Construction way for Dear ole UVa

Well it has been a fun and exciting week, and I personally thank all of you for your visits... all 170 250+ of you that have visited in the last three days - it's very encouraging.

!!! #1 and #2 in Google with "faulconer construction osha" and "faulconer construction epa" !!!

So for Friday and in keeping with OSHA, EPA, OSHA EPA.... today we'll look at another EPA violation.

Whether it is sloth or stupidity may never be known... however when removing sewer pumps the excess fluids DO NOT BELONG IN THE STORM TUNNELS!!!!
The correct way to remove sewer lines often requires a track hoe to lift the pump and the connected tubing to thus drain it before it spills into our rivers and streams.... However if no one from UVa's facilities management is watching it's a lot simpler to just disconnect the thing and let the caca strew about the streets and in to Charlottesville's Rivanna.

Also in the news - have had several inquiries from 3rd parties - if you have anything to say feel free to mouth off on the blog or email me - Got some great photos you want posted? Send them along :)